keo nha cai cup c1 ANNOUNCES FY2025 Q3 RESULTS – RECORD-HIGH BACKLOG NEARLY VND 37 TRILLION, FIRST-TIME ENTRY INTO VNDIAMOND INDEX AFTER RESTRUCTURING

Ho Chi Minh City, April 29, 2025 – keo nha cai cup c1 Construction Joint Stock Company (HOSE: CTD) today announced its financial results for the third quarter of fiscal year 2025 (Q3FY25). The Company reported a record-breaking total backlog of nearly VND 37 trillion. In a parallel milestone, CTD stock has been officially added to the VNDiamond Index by the Ho Chi Minh Stock Exchange (HOSE) during the April 2025 rebalancing, marking a significant leap in keo nha cai cup c1’ position in Vietnam’s financial market.

For Q3FY25, keo nha cai cup c1 posted consolidated revenue of VND 5,003 billion, a 7.2% increase year-over-year, driven by accelerated key project delivery and expanded construction output. Cumulatively for the first nine months, revenue reached VND 16,647 billion, up 15.2% over the same period in FY2024. Gross profit remained under pressure due to a 9% increase in cost of goods sold, driven primarily by input cost fluctuations due to macroeconomic impacts and turbulent in the world. Gross profit for the quarter came in at VND 156 billion, while net profit after tax was VND 57 billion. For the nine-month period, gross profit rose 14% to VND 559 billion and net profit after tax rose 5.8% to VND 255 billion. The gross profit margin improved to 3.12%, up from 2.93% in the previous quarter, thanks to cost optimization and improved project execution efficiency.

CTD stock was recently included in the VNDiamond Index by HOSE in the April 2025 review. This marks keo nha cai cup c1’ entry into this prestigious index after restructuring. This index represents high-quality “blue chip” stocks with high foreign ownership limits (FOL) and is closely tracked by both domestic and international ETFs. Inclusion in the VNDiamond Index signals not only keo nha cai cup c1’ strong financial progress, but also its improved transparency, governance, and stock liquidity.

Record-High Backlog Lays Solid Foundation for Long-Term Growth

Amidst Vietnam’s economic rebound—with Q1 2025 GDP growth reaching 6.93%, the highest in the 2020–2025 period—public investment disbursement has accelerated, pushing the construction market into a clear recovery. Foreign direct investment (FDI) inflows into manufacturing and real estate sectors in Q1 2025 further create favorable conditions for resilient construction players like keo nha cai cup c1.

For the first nine months of FY2025, keo nha cai cup c1 secured new contracts totaling approximately VND 23 trillion, raising the total backlog as of Q3FY25 to nearly VND 37 trillion, ensuring a robust workload for upcoming quarters.

In Q3FY25, keo nha cai cup c1 expanded its portfolio with a series of “repeat sales” projects, including the main construction package of The 9 Stellars by SonKim Land and Gia Binh Airport. Notably, repeat projects now account for approximately 69% of newly awarded project value.

Following successful collaborations with Ecopark on projects such as Ecopark Sky Residences, Swan Lake Onsen, andEco Central Park Vinh, keo nha cai cup c1 has been entrusted with the Eco Retreat Long An project, serving as the contractor for 414 units across Zones 1 and 5.

Photo at the groundbreaking ceremony of the Eco Retreat ecological, trade and tourism urban area project (Eco Retreat Long An)

Additionally, keo nha cai cup c1 is currently executing multiple new projects for Sun Group, including: the Cat Ba Central Bay commercial and tourism complex (low-rise zones C, E, F and shophouse zones D, G, H – kiosks TM1, TM2, TM15, TM16), the Hon Thom – Phu Quoc resort and entertainment complex (Western Village), Olalani Riverside Tower (MEP package), The renovation, upgrade, and new construction project of the Tay Ho Guest House complex; the No. 2 Le Thach project; andthe Bai Dat Do Urban Area project in Phu Quoc (construction of components in zones S2, S3, and S4)

keo nha cai cup c1 also strengthened partnerships with new developers on projects such as: The Global CityandThe Lake Masteri Lakeside by Masterise Homes, Ray River Resort by Ray River Estates, Ho Nai 2 Industrial Park factory phase 1 by KCN Vietnam, and the Greencans Industries metal can factory.

A notable achievement came from keo nha cai cup c1’ continued expansion into infrastructure and public investment projects, including participation in the Long Thanh International Airport Phase 1 (Parking Facility) as part of a consortium with CC1 and FECON, and the National University Development Project – HCMC subproject. These mark key milestones in keo nha cai cup c1’ ability to deliver large-scale, high-specification projects under strict timelines, enhancing its credentials for national-level infrastructure opportunities.

Rendering of Long Thanh Airport Parking Facility

Looking ahead, keo nha cai cup c1 remains firmly committed to its six strategic goals for the 2025–2029 period. The strategy not only aims to solidify keo nha cai cup c1’ position as an “industry leader” in general contracting in Vietnam, but also to extend its regional presence across civil, industrial, MEP, and sustainable urban development sectors. Driven by a spirit of innovation and a bold vision for the future, keo nha cai cup c1 is building a dynamic, modern corporate ecosystem where economic value goes hand-in-hand with human values.

For the full Q3FY25 financial report, visit: /investor-relations-vn/

About keo nha cai cup c1
keo nha cai cup c1 is Vietnam’s leading contractor, with over 20 years of experience delivering large-scale, complex construction projects. The company is a pioneer in adopting technology and innovation to provide optimal construction solutions, contributing to quality of life and sustainable community development.

RELATED POSTS

Hanoi, May 22, 2026 – At the Closing Ceremony of the 5th Nhan Dan Newspaper Innovation Day – 2026, keo nha cai cup c1 Construction Joint Stock Company (HOSE: CTD) was honored with an Encouragement Award for the initiative “Innovation in the ‘Xây Tết’ and ‘Chuyến tàu hạnh phúc’ (Happiness Train) programs”, while also receiving the “Outstanding Companion Partner” award in recognition of its meaningful contributions in collaborating with Nhan Dan Newspaper to implement community initiatives with strong humanistic values. The awards acknowledge keo nha cai cup c1’ efforts in promoting innovation associated with social responsibility and sustainable development. Representatives of partner organizations, enterprises, and Nhan Dan Newspaper staff pose for a commemorative photo at the 5th Nhan Dan Newspaper Innovation Day – 2026 Ms. Dinh Thi Ngoc Bich – ESG Subcommittee Member, representing keo nha cai cup c1, together with other organizations receiving the Encouragement Award for the initiative “Innovation in the ‘Xây Tết’ and ‘Chuyến tàu hạnh phúc’ programs”Mr. Le Quoc Minh, Member of CPV Central Committee, Party Committee Secretary, Editor-in-Chief of Nhan Dan Newspaper, Deputy Head of the Publicity and Education Commission and the Commission for Mass Mobilization under the CPV Central Committee, and President of the Vietnam Journalists Association, presents the “Outstanding Companion Partner” award to keo nha cai cup c1 and other organizations at the event Nhan Dan Newspaper Innovation Day is an annual event organized since 2022 to review innovation initiatives across the organization while honoring projects and ideas with high practical value. Over the years, the program has increasingly affirmed its role as a platform connecting creative ideas

On the morning of May 7, 2026, the Celesta Gold Project was officially launched with a groundbreaking ceremony along Nguyen Huu Tho Avenue, a strategic growth corridor in Ho Chi Minh City. The ceremony was held in a formal setting with the attendance of Mr. Vo Hoang Lam, CEO of keo nha cai cup c1 BU1, together with representatives of the project developers and business partners. Appointed as the main construction contractor for a contract package valued at over VND 1 trillion, the event not only marked the commencement of a new premium residential development in Southern Saigon, but also reaffirmed keo nha cai cup c1’ proven execution capability in the high‑end real estate segment. At the same time, it highlighted the tangible effectiveness of keo nha cai cup c1’ “repeat sales” strategy, as international developers continue to entrust the company with large‑scale projects. Celesta Gold, jointly developed by Keppel, Phu Long, and Nomura Real Estate Vietnam, is built on a land area of more than 1.28 hectares, comprising a 25‑storey development with one basement level. The project is designed to deliver 420 luxury residential apartments, complemented by a commercial podium including officetel units and retail space. Oriented toward sustainable development, Celesta Gold applies Singapore’s BCA Green Mark Gold certification and is scheduled for completion within 19 months. The successful award of Celesta Gold holds significant strategic importance, marking the second consecutive “repeat sale” project that Keppel (Singapore) has entrusted to keo nha cai cup c1 in Ho Chi Minh City, following the successful delivery of The Infiniti project. Commenting on this continued partnership, Mr.

For the fourth consecutive year, keo nha cai cup c1 has secured the No.1 position in the Top 10 Most Reputable Construction Contractors 2026, as announced by Vietnam Report in collaboration with Vietnamnet, reaffirming the Company’s resilient fundamentals amid an increasingly competitive industry landscape. The Top 10 Most Reputable Construction Contractors 2026 ranking, published by Vietnam Report, is built upon  objective criteria including financial capacity, media credibility, and expert evaluations. As Vietnam’s construction sector enters a strong recovery phase, this year’s ranking highlights the clear advancements of leading contractors, not only in business performance but also in their ability to deliver large-scale and complex projects.  Ms. Dinh Thi Hong Tham, Corporate Affairs Director, representing keo nha cai cup c1, received the award Entering 2026, Vietnam’s construction industry has recorded a notable recovery, driven by record-high public investment disbursement and stable foreign direct investment (FDI) inflows. According to Vietnam Report, in 2025, the sector’s gross value added (GVA) grew by 9.62%, outpacing overall GDP growth and reinforcing construction’s role as a key economic growth engine. Nevertheless, the industry continues to face structural challenges, including rising input costs, talent shortages, and increasing demands on project execution capabilities.  keo nha cai cup c1’ sustained leadership is underpinned by strong financial performance. In the first half of fiscal year 2026, the Company recorded revenue of approximately VND 17,459 billion, representing a nearly 50% year-on-year increase, while profit after tax reached VND 523 billion, posting a robust 165% growth. Notably, keo nha cai cup c1 achieved a record-high backlog of approximately VND 62,500 billion, reflecting a healthy project pipeline and

84.28-35142277
Contact@keo nha cai cup c1 .vn

GENERAL INQUIRIES​