keo nha cai m88 Sustainable Construction – Coteccons Shares Its Vision at Archify Live 2025

On August 22, 2025, at the Archify Live conference organized by Hubexo with the theme “Eco-Friendly Architecture – Building a Sustainable Future”, Mr. Dương Trọng Nghĩa, Project Director of Coteccons, participated keo nha cai m88 a panel discussion alongside other industry experts and shared his perspectives on the rising trend of green buildings and the journey of Vietnamese contractors expanding into international markets.

Balancing Quality and Cost – Coteccons’ Perspective

Mr. Nghĩa noted that the tension between cost and quality keo nha cai m88 construction isn’t solely driven by clients—intense competition among contractors, especially keo nha cai m88 the real estate market downturn post-COVID-19, plays a major role.

Mr. Dương Trọng Nghĩa – Project Director at Coteccons

He emphasized: “Clients cannot push prices down if contractors themselves do not engage keo nha cai m88 fierce competition, creating a ‘red ocean’.” Coteccons opts instead to optimize through smart strategies—financial management, centralized procurement, and value engineering—to deliver real value rather than resorting to price undercutting.

Green Buildings – An Inevitable Trend

Regarding sustainability, Coteccons’ representative shared that nearly all their FDI-led projects now conform to green building standards (LEED, Lotus, GreenMark, EDGE). Locally, 20–30% of Vietnamese clients are aiming for green certification.

Mr. Nghĩa remarked that while green buildings used to cost 10–20% more, today the premium is minimal thanks to the widespread availability of green materials and solutions. Crucially, contractors and architects must recognize their responsibility to reduce emissions and contribute to sustainable development.

keo nha cai m88 practice, Coteccons has already implemented multiple green initiatives such as using solar power or LED lights for temporary site lighting, managing dust with rainwater, installing washing bays for construction vehicles, and prioritizing recycled and eco-friendly materials.

Going Global – Opportunities and Challenges for Vietnamese Contractors

A key highlight of Mr. Nghĩa’s sharing was Coteccons’ going global journey. keo nha cai m88 addition to hundreds of projects across Vietnam, the company has already established a presence keo nha cai m88 Laos, Myanmar, Cambodia, and India, while expanding into Taiwan and the United States.

According to him, the strengths of Vietnamese contractors lie keo nha cai m88 their hungriness, strong ambition for recognition, and the experience accumulated from working on FDI projects keo nha cai m88 Vietnam. However, when stepping into international markets, challenges such as differing technical standards, language barriers, and local regulations remain significant.

Mr. Nghĩa emphasized: “The international market, particularly keo nha cai m88 the US and Europe, is booming with demand keo nha cai m88 data centers, renewable energy, and semiconductor facilities. This is a valuable opportunity for Vietnamese contractors to assert their position—but it requires determination, right attitude, and strong adaptability.”

Coteccons – Building Sustainably, Shaping the Future

Through participation at Archify Live, Coteccons once again reaffirmed its strategic direction: not only leading keo nha cai m88 quality and safety, but also committing to sustainable development and actively expanding into international markets.

RELATED POSTS

Ho Chi Minh City — Coteccons Construction Joint Stock Company (HoSE: CTD) has officially partnered with Workday to implement a Human Capital Management (HCM) platform, guided by the core principle of placing people at the center of every decision. The platform aims to build a transparent and trusted work environment where every individual is empowered to grow through clear, connected data. This partnership combine Workday AI-powered HCM platform with a deep understanding of the Vietnamese market and the unique complexities of the construction sector. Workday, a trusted partner to more than 60% of the Fortune 500, is an enterprise AI platform for managing people, money, and agents. Coteccons leads the localization and implementation to ensure the system meets the practical operational needs of the industry. “keo nha cai m88 a shifting macro-economic landscape, Vietnam’s demographic strength—where 70% of the population is of working age (*)—is increasingly redefining expectations for the modern workplace. This new generation of talent prioritizes rapid career progression, real-time feedback, and a seamless digital experience similar to everyday consumer apps. To remain competitive, organizations must prioritize business transformation to build centralized data systems that optimize operations and create a long-term foundation for nurturing talent. For the construction industry, a sector traditionally slower to embrace digital transformation, Coteccons views human resource management not merely as an administrative function, but as a strategic pillar. Partnering with Workday establishes a unified, transparent, and reliable HR platform that enhances employee experience, empowers management to make decisions based on real-time data, and reduces reliance

Ho Chi Minh City, February 5, 2026 – Coteccons Construction Joint Stock Company (HOSE: CTD) officially announces the Report on Bond Issuance Results, confirming that Coteccons has successfully offered 14 million bonds with a total issuance value of VND 1,400 billion. The successful placement is fully aligned with Coteccons’ long-term financial strategy, aiming to diversify funding sources, optimize capital structure, maintain liquidity and operation. keo nha cai m88 the context of a corporate bond market that remains cautious, Coteccons’ successful issuance of an unsecured bond package – is a clear testament to the capital market’s and leading investors’ trust keo nha cai m88 the Company’s financial strength, governance quality, and long‑term growth prospects. For many years, Coteccons has consistently and fully met all of its financial obligations with strict discipline – a principle that has become a core part of the Company’s operating philosophy. The bonds were issued keo nha cai m88 strict compliance with applicable laws, supported by complete documentation, transparent disclosures, and close supervision from regulatory authorities. At the time of issuance, Coteccons maintained a solid financial structure and demonstrated strong business performance. The first six months of fiscal year 2026 recorded significant year‑on‑year growth keo nha cai m88 both revenue and profit, while the Company’s backlog reached a record USD 2.4 billion, reinforcing its financial capacity and ability to meet all obligations related to the issued bonds. The proceeds from the bond issuance will be deployed keo nha cai m88 accordance with the approved plan, aimed at optimizing the Company’s capital structure to support business operations and facilitate expansion during the

Ho Chi Minh City, January 30, 2026 – Coteccons Construction Joint Stock Company (HOSE: CTD) announces its business results for the second quarter of fiscal year 2026 (accounting period from October 1, 2025 to December 31, 2025), continuing to deliver strong growth keo nha cai m88 both revenue and profit. The consolidated results for Q2 and the first six months of FY2026 are as follows: Net revenue for Q2 reached VND 10,007 billion, an increase of ~45% YoY (vs. VND 6,886 billion). Six-month accumulated revenue reached VND 17,459 billion, up ~50% (vs. VND 11,645 billion), completing ~58% of the FY2026 Annual Operating Plan (AOP FY26). Gross profit for Q2 reached VND 371 billion, the highest level over the past 28 quarters, representing an ~84% increase YoY (vs. VND 202 billion). Gross profit for the first half of the fiscal year reached VND 693 billion, up ~72% (vs. VND 403 billion). Net profit after tax for Q2 reached VND 228 billion, up ~115% YoY (vs. VND 106 billion). Six‑month accumulated net profit reached VND 523 billion, an increase of ~165% YoY (vs. VND 198 billion), achieving ~75% of AOP FY26. Net profit margin for Q2 reached 2.28% (+0.73 percentage points YoY); six‑month net profit margin reached 2.99% (+1.30 percentage points YoY). These positive results stem from Coteccons’ consistent execution of the six strategic priorities set at the beginning of the fiscal year, notably Strategic Pillar No. 4: Effectively improve profit margin through cost optimization and revenue scaling. Within this pillar, the Supply Chain

84.28-35142277
Contact@Coteccons .vn

GENERAL INQUIRIES​